Let's continue from previous blog I've posted on
Proposal Refurbishment Project for Existing Bus Station (bubble diagram) So I will continue on the detail drawing. As I mention before this, we had done a measured drawing for Kuala Perlis Bus Station. We took two days if I'm not mistaken to get all the measurement before transfer it to ACAD.
Below are the actual plan for Kuala Perlis Bus Station. We do the measurement on 2014. But now I don't know what the bus station looks like. Maybe has been upgrade to better facilities & looks. Thanks to all my classmate. They are doing a really good job!! Clap Clap Clap
 |
| Floor plan |
 |
| Cross section |
 |
| Section |
 |
| Left elevation |
Next post I'll talk regarding my team proposal for the bus station. Actually this project is really challenging but yet fun. Because we need to know what is refurbishment concept.
Ok. That's all for this post.